DC01 cold-rolled steel sheet
DC01 cold-rolled steel sheet is mainly used for general shaping and processing of refrigerator and other household appliances hell, oil drums, steel furniture.
- DC01cold-rolled steel sheet mechanical properties:
|
Grade |
MPa |
MPa |
Elongation % A80mm not less than |
r90° |
n90° |
||||||
|
mm nominal thickness |
|||||||||||
|
<0.30 |
0.30~<0.50 |
0.50~<0.70 |
0.70~<1.0 |
1.0~<1.6 |
≧1.6 |
Not less than |
|||||
|
DC01 |
140~280 |
270 |
24 |
26 |
28 |
30 |
32 |
34 |
_ |
_ |
|
a. when there is no significant yield, RP0.2 should be used; otherwise ReL should be used. When the thickness is more than 0.50mm and not more than 0.70mm, the specified value of the yield strength is allowed to increase 20MPa; when the thickness is not more than 0.50mm, the specified value of the yield strength is allowed to increase 40MPa.
b. The sample is the P6 sample in GB/T 228 and the sample direction is transverse.
c. The requirement of r90 and n90 values apply only to products with the thickness not less than 0.50mm. When the the thickness is more than 2.00mm, the value of r90 is allowed to lower 0.2.
d. The upper limit value of DC01 yield strength applies only to products within 8 days since the manufacturing date.
Popular specifications are in short supply!
click to get the specification sheet!
- Available range of DC01 cold-rolled steel sheet for appliances:
|
|
Nominal size |
|
|
Thickness |
0.25-3.5 |
|
|
Width |
800-1830 |
|
|
Length |
Steel plate |
1000-6000 |
|
Steel strip |
Coil inside diameter 508,610 |
|

Specifications Of DC01 cold rolled steel Plate
| Standard | GB/T5213-2008, Q/BQB 403-2003 |
| DIN EN 10130-2006 | |
| Thickness | 0.15mm-300mm |
| Width | 500-2250mm |
| Length | 1000mm-12000mm or according to the customer's special request |
| Tolerance | Thickness: +/-0.02mm, Width:+/-2mm |
| Package | Bundle with steel strip, Container shipping |
| Material | stainless steel/galvanized steel/mild steel/carbon steel |
| Capacity | 200000 tons /month |
| MTC | can be supplied before shipment |
| Inspection | The Third Party inspection can be accepted, SGS, BV |
| Price Term | FOB, CFR, C&F, CNF, CIF |
| Delivery Time | 7-15days after receiving the down payment |
Application Scenario